We offer an expert consultancy on drawing T&C strategy and plan. For software, hardware or mixed type systems, we offer systematic T&C approach to:
- Facilitate testing to verify the delivery of the intended functionality
- Commission assets, certify them compliant with the applicable standards, and safe to
Throughout this approach, we developed a phased certification process:
- Phase 1: Factory Accepting Testing (FAT) Result: Factory Acceptance Certificate (FAC)
- Phase 2: Per System Level Test Result: Installation Permission Notice (IPN)
- Phase 3: Pre-commissioning per System Level Test Result: Pre-commissioning Certificate (PCC)
- Phase 4: Systems Integration Test Result: Partial Acceptance Certificate (PAC)
- Phase 5: Operational Test (commissioning test) Result: Acceptance Certificate (AC)